Go2 Group were engaged to provide structural stabilisation and repairs to an existing staff ablutions block. The existing structure was severely dilapidated and the foundations were failing. Careful demolition was required and Go2 Group adapted the scope of works as the full extent became known.
Once the area was stabilised, we rebuild the external footings and walls, remodeled the ablutions and showers to provide staff with safe, modern amenities.